PF CONSULTANCY

Generator NOC

Generator NOC – Compliance & Approval

We provide expert services for obtaining Generator No Objection Certificate (Generator NOC) as per the regulations of the State Pollution Control Board (SPCB), Central Pollution Control Board (CPCB), and local municipal authorities. A Generator NOC is mandatory for the installation and operation of diesel generators (DG sets) to ensure compliance with environmental and noise pollution norms.

 

Our Key Services:

Generator NOC Application & Approval:

  • Assistance in obtaining NOC for new generator installation.
  • Guidance on required approvals from pollution control boards and municipal bodies.

Documentation & Compliance Assistance:

  • Preparation and submission of generator installation plans.
  • Compliance with emission and noise pollution norms as per CPCB guidelines.
  • Ensuring adherence to fuel storage safety regulations.

Inspection & Approval Process:

  • Liaison with State Pollution Control Board (SPCB) and municipal authorities for site inspections.
  • Assistance in addressing objections or modifications suggested by regulatory bodies.

Generator Pollution Control Measures:

  • Guidance on installing acoustic enclosures to reduce noise pollution.
  • Assistance in setting up chimneys and exhaust systems as per environmental norms.

Renewal & Periodic Compliance:

  • Assistance in NOC renewal as per pollution control guidelines.
  • Support for upgrading generator setups to meet updated emission standards.

We ensure seamless approval and compliance for obtaining Generator NOC, helping businesses and establishments meet environmental safety regulations while ensuring uninterrupted power supply.

Frequency Asked Question

  • A Generator No Objection Certificate (NOC) is an approval from the State Pollution Control Board (SPCB) and local authorities to install and operate a diesel generator (DG set) in compliance with environmental and noise pollution norms.
  • Any commercial, industrial, residential, or institutional establishment using a generator above 5 kVA capacity must obtain a Generator NOC as per CPCB/SPCB guidelines.
  • The application is submitted to the State Pollution Control Board with necessary documents, including generator specifications, site plan, and emission control details.
  • DG Set purchase invoice
  • Manufacturer’s emission compliance certificate
  • Site layout plan
  • Acoustic enclosure compliance certificate
  • Fuel storage and safety details
  • Step 1: Submit an application with required documents.
  • Step 2: Site inspection by authorities.
  • Step 3: Compliance verification for noise and emission control.
  • Step 4: Approval and issuance of Generator NOC.
  • The process typically takes 15 to 30 days, depending on the location and regulatory requirements.
  • No, Generator NOC must be renewed periodically, usually every 1 to 5 years, based on pollution board regulations.

No, a new NOC application must be submitted for the new location. The existing NOC is not transferable.

  • Regular maintenance, installation of acoustic enclosures, adherence to fuel storage regulations, and periodic pollution control board inspections ensure compliance.
Call Now Button